Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: myturns
  • Content: Threads
  • Order by date
  1. myturns

    How long it will take flood a vertical pipe if the bottom of pipe cut

    HI! Could anyone help me? Water Depth is about 1km. the vertical pipe is also 1km length vertically and empty but we try to cut the bottom of pipe by blade so the water will flow inside the pipe from bottom. Do you know how to calculate the time to flood fully up to a sea level? Pipe size is ID...
  2. myturns

    Is triple shear of bolt possible?

    Bolts subject to shear are designed for both single and double shear. Double shear stress is half of single shear stress in case of same bolt. If double shear is better than single, why don't we use there triple shear, or quadruple shear, etc.? could you explain why triple share is not possible...

Part and Inventory Search