We have been checking a site daily to see if the soil is still frozen in the rooms they are heating. They want to pour the floor slabs as soon as possible, but can't if the floor is still frozen. The soil is 4 - 8 inches of granular A on top of granular B fill or native, fairly clean sand. They...