Putting a doorway in an existing 10" CMU wall. If this were new construction we would place reinforcement on either side of the opening, parallel to the jamb. What is typically done for placing a door in an existing wall?
Thank you in advance.
In working with Figure 3.11.5.6-6 in the AASHTO LRFD Bridge Design Manual, I am finding conflicting opinions on how to handle the increased embedment of 1.2D. I consulted a Geotechnical engineer who stated the 1.2D is performed to achieve a F.S.=1.5. I reviewed references stating the 1.2 factor...
I am a structural engineer early in my career and recently made a switch from building design to bridge design. I am finding it difficult adjusting to the new culture of bridge design and I am looking for some advice. With a few projects under my belt at my new company, I am finding the trend...