Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Trop99
  • Content: Threads
  • Order by date
  1. Trop99

    12% increased for temporary works BS8002 cl. 4.4.4.2

    in BS8002 cl. 4.4.4.2 "The allowable stresses given therein may be increased by 12 % for temporary works of short duration." Does this clause refer to only steel sheet pile or related temporary works such as strutting, waler etc?
  2. Trop99

    Moment connection (Steel + bolted)

    Hi all, The examples of bolted connection I could put my hands on are showing end of steel beam bolted to a steel column in a vertical manner. My question is, given a situation where a square steel frame, loaded in all four sides, vertical loading is higher than the lateral loading, is it not...

Part and Inventory Search