  1. saadeh

    About Permissible Stresses in Tendons as per AASHTO LRFD section 5.9.3

    Dear fellow bridge engineers, I'm currently working on a local bridge project which employs precast, post-tensioned girders, and the other day I had an argument with the consultant and my prestressing sub-contractor (Dywidag) about the permissible stresses in stressing strands and it turned out...
  2. saadeh

    Load Distribution Factors for a Non-Composite I Girder

    Hi all! I'm a bridge engineer at a local company and my boss assigned me a task to check the design of one of our projects and I'm confused a little bit about the type of girders we have here. The girder section is a non-standard Precast post tensioned girder which has a shape nearly as an I...
  3. saadeh

    Approach Slab of a Concrete Bridge

    Hi all! Last time I provided shop-drawings the Consultant of my project (which is a concrete pre-stressed girder bridge) he argued about the location of the approach slab with reference to the abutment mirror (the abutment vertical stem which has a lesser thickness than the abutment main load...
  4. saadeh

    Special specifications of splicing for a bridge pier having two layers of reinforcement

    Hi All.... Right now I'm preparing shop drawings for a new bridge and I'm having some trouble with the quality of the original drawings made by the designer and I have to figure out a lot of stuff from these poor-low-quality-somehow-useless drawings. As of now, I'm reconstructing the lost...