Hello and sorry for what I think is a dumb question, but I was unable to find what I am looking for elsewhere, then I thought you guys could easily help me here.
I am trying to calculate what the flow rate from a water service should be. I know that the simple formula is Q=AV (flow rate = area...
I was wondering if anyone in the deep utility (i.e water, wastewater) repair/replacement industry would have (and be willing to share) their method/spreadsheet for estimating volumes of materials required for trench excavations? (i.e screened rock, crushed gravel, pit run, sand, native backfill...