  1. engineerpiep

    DFT readings

    Sherwin Williams Zinc Clad II has a time to recoat of 18 to 48 hours depending on environmental conditions and a time to cure of 7 days. Can I get an accurate DFT reading after time to recoat using a positect dft gauge? Also I have a paint system spec that has Zinc Clad II, Dura-plate 235 and...
  2. engineerpiep

    Blast profile

    I have a specification that calls for a surface preparation of 1.5-2.0 mils. It was blasted and measured with Press-o-film testex and measures 4.0 mils. Is more mils better for adhesion? Is this acceptable? What should I know?