Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Adrian48
  • Content: Threads
  • Order by date
  1. Adrian48

    road crossings for two-phase flow pipelines: when to ignore static head downhill recovery?

    For our current project we have to model a two-phase oil gathering system. The terrain is essential "flat" but the pipelines, which will be installed above ground, have several road crossings. Is it normal when modelling a two-phase system to also ignore the static head "downhill" recovery...

Part and Inventory Search