Hi all and thx for taking the time to share the knowledge
I'm a young struc. eng. and I have some concerns about the current task I'm facing.
The scaffold for facade work is to be built out of rux65 super, but the base is to be in line with 1st floor lvl (some 4-5m above the ground lvl-sloping...