Hello, is it possible to open the 2nd NX when one is already open? Without Teamcenter it was possible and it was quite handy to work 2 projects at the same time. I have NX9 and Teamcenter 10.
Thanks in advance.
Hi all,
I need a help with this task which I could not find out myself. I have a component and I want to add it to one assembly about 50 times in different locations. I have the x,y,x coordinates in a text file. How to do this fastest way instead of adding component one by one and writing...
Teamcenter 10, NX 9
Hi all,
I have a main assembly in NX and in this main assembly I have 4 different sub assemblies(lets call them A,B,C,D). In these A,B,C,D sub assemblies, I have some same components. When I want to order the components in main assembly, I send it to structure manager and...
Hello,
sometimes on drafting side some lines are lost. Does someone know how to bring them? In the file I attached you see a small assembly and the lines of the guide rails are disappeared(even though you can see end part of it)...
Hello,
I am a mechanical designer used to design welding fixtures and visual inspection fixtures but for the first time I am asked to design a fixture for a subframe part to be measured in a Coordinate Measurement Machine(CMM).The CMM is Wenzel brand bridge-type granite CMM using Metrosoft...