I am having a large ICF home built. It is an on grade slab with 36" footings and a 4" slab. The foundation was engineered.
Shortly after the pouring started rain came that lasted for nearly 6 hours, basically during the entire pour. Rain varied from heavy to light. Parts of the slab were...