  1. Ringoo

    Concrete cracking

    Hi, I am in the process of checking the data supplied by the contractor on the temperature measurement from the thermocouples installed at the core, left face, right face and top face of 12 ft high wall which is poured in one lift along with other walls perpendicular to it. The wall is 36 ft...
  2. Ringoo

    Road Closure Gate,12 ft wide and 27ft wide (swing gate)

    Hi, I am looking standard typical details for the 12ft and 27ft wide road gate (Swing type) for a very old facility. I would appreciate if somebody can send me the typical details for the same as I don't want to invent something new. Regards
  3. Ringoo

    Anchor bolts/rods-available in 1930

    Hi, I am looking for information on the yield point(ksi) and the tensile strength(ksi) for the anchor rods available during the year 1930. The existing drawings just call out 1-5/8" dia anchor rods. Regards
  4. Ringoo

    T Bar Ceiling

    Hi all, Can anybody please shed light on the what is the Canadian code for the design of T bar ceilings. Is there any standard/drawing that I can refer too as its my first time working on the same. Its for commercial building with area less than 2000sq.ft. Regards
  5. Ringoo

    simply supported beam subjected to torsion with top flange unrestrained.

    I am designing a simply supported beam subjected to torsion and flexure .The beam spans 24ft and is subjected to point load of 18kips at e=4” at 1/3rd and 2/3rd of the span. The beam sitting on concrete platform at the ends .The top flange and the web are not laterally restrained ,but the...
  6. Ringoo

    Monorail Splice

    Hi, I am designing a monorail. The total span is 21m.The maximum lifted load is 9MT.The section used is S610. The monorail is simply supported from its top flange at 4 location i.e. each span is 7m and wheels are rolling for the bottom flange of S610.This monorail will be installed outside the...