What are the requirements/regulations for the walers in soldier pile walls? Specifically I'm interested in the vertical distance between walers requirements. Wood lagging is used for these walls.
Hi all.
I have a question about water flow through soil.
Let's say we have a rectangular container with a given size (400 ft x 200 ft x 20 ft). It is filled with a fully saturated soil with a given coefficient of permeability (18.9 GPD/sf). If we remove the bottom of the container, can we say...