Good afternoon,
Being new to the job, I reviewed a Quality Control Procedure which mentioned the need for preheating the area of the weld repair 150 degrees F. higher than the normal welding procedure preheat temperature. We have looked in ASME Section IX, Section VIII, Section V, API-8C and...