Hi,
in the frame of geting a local regulatory approval, we are asked to do the proving of coriolis meters onsite. Some of the meters are for gas and others are for liquid. The problem is that the manufacturer said that there's no way to do the proving onsite while the local legal metrology...
I need your support please.
I'm about to install a screw pump to transfer crude oil through 18 Km of 8" pipeline. As a safeguard, the pump is equipped with an integrated Pressure relief valve plus a high pressure switch which will be installed on the discharge line of the pipe to trip the pump...
I'm about to prepare a PQR with a Pipe smls NACE BE 4'' S-40S A790UNS S31803 B36.19. Test coupon: two pup pieces of 150mm butt welded each one to another
The welding process used for qualifcation is as follow:
Root Pass:
- GTAW Process
- Filler metal: ER2209 2.4mm
- shield gas: Argon
-...