Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations LittleInch on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: LewisLiew
  • Content: Threads
  • Order by date
  1. LewisLiew

    Can bend beam Rebars 90 deg vertically inside lift wall instead of straight towards wall?

    I am inspector of work. Would like to know whether bottom or top rebars for 1st floor beam CIS B 4T32 to bend 90 deg to top/bottom at approximately 300mm (Drawing shown straight 1200mm inside lift wall & 800mm each). I am asking because contractor will put foam at lift wall 300mm so later can...
  2. LewisLiew

    Sump pit of lift core reinforcement

    Image1 below shown reinforcement for sump pit. Would like to know why reinforcement in Image2 not suitable.
  3. LewisLiew

    Minimum distance between 2 construction joints

    Would like to know minimum distance between new construction joint & existing construction joint. They are parallel to each other.
  4. LewisLiew

    Cast small portion of 2000x2000 on pile cap to install column?

    Contractor want to cast 2000mmx2000mm inside pile cap(L=3900mm x W=2400mm x h=1800mm) so they can install precast column(800mmx800mm) as per attached photo. Is that acceptable?
  5. LewisLiew

    Stump & column reinforcement

    Ground slab previously 150mm thk with ground beam 1000mm depth but now replaced with 450mm mm flat slab. If pile cap depth is 1800mm then pile cap depth below flat slab will be 1800-450=1350mm. Would like to know how is orientation of rebar for S2(refer to photo attached). Is that OK if...
  6. LewisLiew

    Casting concrete directly to pile cap which has muddy water

    Is that appropriate if casting concrete directly to pile cap which has muddy water at bottom of pile cap & hole for water flow through at side formwork? I was told concrete can push water due to its density. Will it absorb some water and weaken it's strength? Would like to know reasons if not...
  7. LewisLiew

    Concrete cover pile cap

    May I know concrete cover for side pile cap count from binder tie link or main vertical bar?
  8. LewisLiew

    minimum distance between 2 pile caps

    What is minimum distance between 2 pile caps? My drawing show both pile caps touch each other. Shall I put polyfoam between pile caps?
  9. LewisLiew

    Ducting install outside of links beam?

    My Subcon installed ducting outside of links for a beam to fit a light point. Any rule which I can follow or any disadvantage?
  10. LewisLiew

    Ductings between top & bottom reinforcement

    ACI 6.3.9 said solid slab we need to put ductings between top & bottom rebar. How about RC staircase?
  11. LewisLiew

    Lift Hall call button and rebars

    Looking for opinion: Hall call button for a lift is 300(h)x150(w) and it located on junction of rc wall and rc separated beam, both are 230 width. Before concreting, when I inspected reinforcement, spacing 2 rebars with 20mm dia. left 100mm only. How can I fix it?
  12. LewisLiew

    Different concrete gred for beam and column

    Vertical member like column and wall G40 while hor. Member like slab and beam G30. How to cast beam? Is that possible to cast beam and column's rebar together?
  13. LewisLiew

    Spacer bar requirement

    I am using spacer bar 25mm dia each of 1500 mm lgth of beam to separate 2 layer of rebars. Any requirement for lgth of spacer bar?
  14. LewisLiew

    Vibrating concrete with 12" to 24" thick each lift

    I will use mobile crane to drop concrete to 2.6 m deep pile cap. My workers will vibrate each lift of 12" thick concrete with 6" inside lower lift of concrete. My question is how many drum (0.7 cu.m/drum) should I drop before I need to start vibrate? Can I just fill out 12" thick of the pile...
  15. LewisLiew

    Split and extend tie rebar at corner pile cap

    A pile cap with L shape will be constructed. Tie bar in Internal corner will always split and extent into pile cap with lapping length. I understand that the tie bar is useless if I am not doing so. Why and what this rebar/ fenomena called?

Part and Inventory Search