dear all
We want to request for a new Benzene pump (OH6 type). based on licencor (UOP Honeywell)spec, the seal arrangement must be tandem with API plan 52 & 31 while for other non OH6 types double arrangement with API plan 53 A or 53B are recommended. I checked the burgmann or JC selection...
We have a naphtha sundyne pump LMV 322 in our plant. flushing plan is 31 (internal cyclone separator) & API plan 62 with steam quench to avoid cock formation in atmospheric side. My question is whether we can use sundyne non-contacting dry gas seal instead of using segmented floating bushing...
Hi
We are installing a sundyne LMC-337 compressor in our gas refinery. the gas is 99% methane. the suction and discharge pressures are 25 barg and 27 barg respectively. the buffer fluid is process gas that enter from port 2. the mechanical seal arrangement is tandem that will be attached. the...