Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: adam08285
  • Content: Threads
  • Order by date
  1. adam08285

    Constant Spring Hanger Vertical Angle Greater Than 4 Degree

    Guys, [peace] According to MSS SP 69, "If horizontal pipe movement results in a vertical angle of the hanger rod greater than 4 degrees, common practise is to either offset the pipe attachment or structural attachment by the amount of anticipated rod swing or provide a traveling device for...
  2. adam08285

    Constant Spring Hanger Setting During Commissioning

    Hi guys, For constant spring hanger (lug attached to a structure case), we will carry out cold setting as per stress designed during cold condition before the piping is put in service. In commissioning stage, which by right the locking pin has been removed, the supported pipe will travel up to...

Part and Inventory Search