Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: cfox142
  • Content: Threads
  • Order by date
  1. cfox142

    Different Composite Deck Capacities - Vulcraft vs. New Millennium

    I am looking at an existing building with composite metal deck and composite beams (shear studs). I am looking at the floor for some additional equipment to be added. From this I noticed that the composite deck capacities from Vulcraft and New Millennium vary quite a bit. The floor system is...
  2. cfox142

    Notching HSS Column

    I have been asked to design reinforcement for a HSS column that needs the face notched out. This is a freestanding platform in an industrial building. The platform is 14 ft tall and has angle kickers for lateral stability. The column to be notched is a HSS 6X6X1/4 and the notch will be on one...
  3. cfox142

    Efficient Moment Frame Design

    Assuming you meet any prescriptive code requirements and connection design requirements etc how do you optimize a moment frame? It seems to make sense to me that you would want the moment of inertia of the beam and column to be roughly equal except in high seismic areas where you need strong...
  4. cfox142

    Wind Borne Debris Prescriptive Wall Requirements

    I have a project near the coast in South Carolina. I am under 2012 IBC with a wind speed of 130 MPH. I plan on having a bypass metal stud system for the exterior walls. The walls are cladding only, my primary lateral system will be moments frames. Are there any prescriptive requirements for...
  5. cfox142

    Perforated Shear Wall Anchorage Between Ends

    We usually do a couple 3 story wood framed apartment buildings a year. I have always designed these with segmented shear walls and had hold downs at pretty much every corner and wall opening. Recently contractors have been complaining about the cost of this system. To limit the amount of hold...
  6. cfox142

    Wood Shear Wall to Meet 2012 Energy Code

    I am starting to get more projects that are under the 2012 Energy Code. Normally I don't bother with this and let the Architect figure it out but with the new code it seems there is a clause to have continuous insulation. From what I have been told this means that the insulation between the...
  7. cfox142

    Metal Stud Box Header Unbraced Length

    I am looking at a typical metal stud boxed header with (2) studs vertical and a track on the top and bottom. What do you consider the unbraced length for bending? Do you assume the top track fully braces the compression flange of the studs? I have always considered this unbraced unless I add...

Part and Inventory Search