Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SDETERS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. LuckyCharms

    § 192.505 part b - pressure test boundary

    The code below requires stations to be pressure tested to at least class 3 location requirements. What constitutes station piping? I'd assume everything downstream of the inlet valve, but I've seen nothing clearly defining that boundary. "§ 192.505 Strength test requirements for steel pipeline...
  2. LuckyCharms

    Unknown equipment at meter station

    I found a covered device while looking through some photos and I'm having a difficult time pinpointing what exactly it is. There appears to be a handle and potentially a bleed port. Based off location, a blowdown would make sense, but I've never seen this sort of equipment for that process. Any...
  3. LuckyCharms

    Expansion Loop Spacing

    I'm a young engineer in an environment lacking of pipe stress experience. To this point I've been responsible for pipe stress analysis of O&G facilities. I've picked up all I currently know from these forums, textbooks recommended on here, and through pipe stress programs. I've gotten by fine...

Part and Inventory Search