Hello everyone,
I am working on an underground Recycled Cooling Water Line and we are adding a 12" drain to this line which requires the addition of an underground 12" gate valve.
Design conditions are 24C and 100psi.
I am just wondering what the best way to go about this would be. I am...
Hello everyone,
just wondering if anyone has come across a situation where they needed to install a branch pipe on a header in a way that the center lines of the branch pipe does not intersect with the center line of header? I have attached a drawing which shows this case...
Hello folks,
I was wondering if someone can help me with this issue.
I work for an oil and gas EPC and we are currently designing a fire water system to protect one of the hydrocarbon tanks on site.
All the piping is as per ASME B31.3 which is what the client pipe classes are based off...