Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations pierreick on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: zubair2930
  • Content: Threads
  • Order by date
  1. zubair2930

    MCCB in place of a disconnector

    Dear All, Sometimes when I go to the field, I find that sometimes they have installed MCCB in place of a disconnector to the supply side of a three phase machine. Is it a safe practice or they should install disconnector there and I should point it out as a safety violation ??
  2. zubair2930

    part winding motor testing

    I received a complaint of a faulty part winding motor. well, the motor i am dealing with has 6 terminals and its diagram is attached. i checked the winding terminals with a multi-meter and i found out that there was no connectivity between terminals 1 and 2 and I gave the report that that...

Part and Inventory Search