Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Jmorgans1122

    Soils testing. Previously compacted fill material is now saturated

    The contractor backfilled an area adjacent to a plinth beam with a 3/16 minus limestone material and will be supporting a slab on grade (I'm not sure if the fraction is exactly correct but the material had no large aggregate and was mostly fines). The material was placed in 8" lifts, compacted...

Part and Inventory Search