I am designing a School Building (R.C.C) Which is 150 ft Long and 38 Feet in width.
do i need a expansion joint for the length of 150 feet of the structure??
can anyone give me any codal reference for that ???
Hello Everyone,
Currently i am working on 4-Storied School Building Project where a senior structural engineer is taking care of the structural issues.
Last day he has sent me a drawing where i found the foundation is placed over ground on compacted sand.
here the soil is stiff clay but he...
Hello Everyone,
Currently i am working on 4-Storied School Building Project where a senior structural engineer is taking care of the structural issues.
Last day he has sent me a drawing where i found the foundation is placed over ground on compacted sand.
here the soil is stiff clay but he...
Hello Everyone,
I am civil engineer and willing to get a good professional accreditation which will be helpful for my professional growth.
From recent trends in our profession i am observing two major accreditation are taking place, which are:
1. PMP Certification
2. LEED GA or LEED AP...
Hello Everyone,
I am civil engineer and willing to get a good professional accreditation which will be helpful for my professional growth.
From recent trends in our profession i am observing two major accreditation are taking place, which are:
1. PMP Certification
2. LEED GA or LEED AP...
Hi Everyone,
I would like to know about your opinion regarding consideration of a slab’s bending resistance (transverse bending stiffness) to the lateral load resistance of a column – beam rigid frame structure…………
In the “Tall Building Structure” – Stafford smith, Alex Coull, it is suggested...
Hello Everyone,
Last day i went to visit a site and found 2 piles of a 4 piles group has been shifted 1 ft away from drawing location.
Now, how can i solve the problem to ensure all the piles will be active under column loading ???
if i need to design the pile cap according to as cast...