  1. TarikHKJ

    Hi, Small question, does it mak

    Hi, Small question, does it make a difference which rebar goes above which in a slab or a footing mesh in the xy plane? Does it depend on the rebar diameter or the length of the X or Y...
  2. TarikHKJ

    Pressure inside the tanks connected with 0.5 pipe

    Hi, Im new to this forum and I have a question about the Pressure in the lower water tank which is supplied by gravity from the upper tank by half inch pipe in the picture below. . Thanks in advance!
  3. TarikHKJ

    Is it allowed to mix rebar diameters in flexural members?

    Hi, Is it allowed to mix rebar diameters in flexural members like beams and ribs in a ribbed slab? What is the implications of that? Wouldn't the smaller diameter bars yield before the larger ones under loading making them useless? Thank you!
  4. TarikHKJ

    Column placement suggestions

    Hi, Can you suggest suitable column placement for these plans, I find it difficult since the floors are shifted from each other, especially the 2nd basement floor on the far right. File is attached Thank you...
  5. TarikHKJ

    Column Placement dilemma

    Hi, In the cad drawing attached there is a column that sticks out in the middle of the room in the 1st floor as you can see here . I don't know what to do, should I just ignore enlarging the column to accommodate both beams from each side and Just have a beam to beam connection? but that...
  6. TarikHKJ

    Large Beam to Support Column dimension ratio

    Hi, What considerations should be kept in mind when dealing with big difference between column and beam dimensions? for example in a ribbed slab Main Beam dimensions: b=1000 mm , h=300 mm Column dimensions: D=250mm circular Thank you
  7. TarikHKJ

    Water Stopper lost during pouring, what are the options?

    Hi, Its 20m x 20m water tank, 5.5m height 2200 m3. After pouring the raft footing something went wrong with the water stopper on one of the sides and it got loose from the footing completely, What are the possible options for this situation? Thank You!
  8. TarikHKJ

    Planting a slab to existing building

    Hi, I want to convert this staircase to a regular room, Image I have a couple of questions about how to tackle this, I thought people with some experience here will help. 1: When removing the existing slab "1" (25 cm solid slab) with Helti jackhammers, where should I start, from the sides to...
  9. TarikHKJ

    Delay strip in two way ribbed slab

    Hi I need help implementing a delay strip in a 50 cm waffle slab, i tried to find information for detailing in detailing manuals but couldn't find any , I hope someone here would help me to find resources for designing and detailing a delay strip in rc slabs. Will provide information if...
  10. TarikHKJ

    Formwork removal of slab embedded beams?

    Hi, In a two-way ribbed slab with embedded beams, this table from ACI code for formwork removal says 14 days for slabs and 21 days for beams, Does that mean the contractor should not remove the formwork of the beams until the 21 days have passed, or are the beams part of the slab and their...
  11. TarikHKJ

    Fixed-end moments for Trapezoidal load on part of span?

    Hi, Trying to solve an indeterminate beam using moment distribution displacement method, I used the general fixed-end moment equations, but one span has a trapezoidal load on part of the span which does not have a fixed-end moment equation, here is the problem...
  12. TarikHKJ

    Installing Column Rebar at <90 angle?

    Hi, I work with the consultant in a reinforced concrete building project, the column sections for the next story will be resized from 100x50 to become 80x40 cm, the contractor suggested that he wanted to do this : image: http://s19.postimg.org/h519or3ib/screenshot_44.jpg The contractor does...
  13. TarikHKJ

    Ad Hoc Construction Joint in Waffle Slab?

    Hi, I'm not sure if this is going to sound a bit stupid but here's the situation: I work at an 8-story parking garage building project, we already completed the first waffle slab and now the second slab is on its way, awaiting confirmation for the time to pour concrete, but one of the...
  14. TarikHKJ

    What is the Diffrence between Ground Beam and Tie Beam?

    Hi Is there a difference between Ground beam and Tie Beams? or are the different names for the same thing?
  15. TarikHKJ

    Question about 'Drop beam' - Wall connection

    Hi (Metric Units) What is the detailing for the connection of a drop beam (B=60 H=70) on a bearing wall (width=40 cm) the beam is dropped 35 cm below the solid slab (thickness=35 cm) ? Is it ok to load a drop beam on a wall with no embedded column in the wall section? the beam bottom steel is...