I am building an above ground pool sitting on concrete piers founded onto rock(due to slope of the land most of the pool including the base is above the ground).
The engineer has specified N12-200 bars each way on each face.
Trying to get quotes and a pool contractor to build it - all...
Need to demolish a section of an existing masonry brickwork chimney - section between ceiling and ground floor needs to go while maintaining the section from ceiling level and above. Section of chimney to be retained is 470mm X 470mm and about 3.0m high.
The builder wants to just use steel...