Our engineering drawings state "THREADS IAW FED STD H28A" in the tolerance block.
My question is... WHY? I've asked around and since it out dates most of the people here, nobody seems to know why.
If we removed it, it would envoke ASME Y 14.100 which references 14.6 which references ASME B1.X...
Our Engineering department is having a debate regarding when to add Revision Approvals (Names/Dates) to a drawing. Keep in mind that we document both Initial Releases and Revisions on an ECO (Engineering Change Order) via Oracle ERP. Also, depending upon the contract, the customer may need to...
Looking for feedback from people who are EXPERIENCED in defining Controlled Unclassified Information (CUI).
Applicable standards include:
32 CFR §2002
DFAR 252.204-7012
FAR 52.204-21
NIST SP800-171 Rev 1
FIPS Publication 199
FIPS Publication 200
My questions are:
1. If our ERP only contains...
We are trying to standardize on what verbiage we use to indicate that a drawing has not been released for production. We have 8 designers whom all have there favorite.
Historically, one of the following:
PROTOTYPE
Pros - Clearly states the intended use of the part and usually, the state/phase...
Many of our components consist of complex multi-step bores and or threads.
In an effort to reduce overly redundant Feature Control Frames we would like to have add a general callout to our tolerance block.
I've seen "ALL COAXIAL FEATURES TO BE RUNOUT WITHIN .005" before, but I thought runout...
Our current practice is to have the Drafter/Designer electronically add ALL signatures and dates (even for a new release) after the ECO is approved. There is nothing stopping them from making last minute edits (intentional or not). Then they create a PDF and publish the drawing.
My strong...