I'm working on a renovation to an existing building. The walls are 8" block w/ 4" brick. We're making a rather large opening in the existing wall for the new entrance (roughly 20' long) and the customer wants to go with a pinch beam lintel (2 channels with thru-bolts). The lintel will have about...
Hi Everyone
I've got a question from a contractor. They're pouring a cylindrical foundation for a strain pole and only got to pour about half way. They need confirmation that no integrity is lost from finishing the pour after the first half has already set. Full rebar cage is already in place...