What do they reference? I’ve had multiple jobs with same type structures and different reviewers comment/reference different codes. They are never on the same page.
If I’m trying to bid a job, what can I expect?
I have a question involving welding. I am welded a 4x3 member to a 6x3 member. I cannot get a weld to work. From testing, it was found that we can only get 1/8" weld penetration from the groove weld. I am wondering if I can add a "stiffener" in to get extra weld length.
The left is a plan...
I'm designing aluminum tubes and am wondering about checking lateral torsional buckling. Steel doesn't require you to check this for tube shapes but ADM (2015) doesn't state you can neglect it. I don't think this will ever be the controlling failure mode but the equations don't work out that...