  1. brvs2014

    Yee Wye Diverter

    There is a Yee type derivation for Pipeline, the objective is that two lines are marraneable and are connected by a Yee menconada, I would appreciate if you could help me with any brand or brands that manufacture this accessory or in turn some catalogs. Best regards.
  2. brvs2014

    procedure for load tests on a structural bridge

    You could help me with a procedure for load tests on a structural bridge, we need to release the bridge and request the procedure of the load tests, I am grateful
  3. brvs2014

    Pressure Hidrostatic vs admissible pressure

    can the hydrostatic test pressure be greater than the admissible pressure?
  4. brvs2014

    how to justify that I can use API 5L gr B pipe since I do not have Api 5L x60 pipe

    in a water reinjection project we use api pipe 5L Gr B, since the material is contemplated in the customer's Piping Class, however for this project a piping class was created in which the pipe is specified as Api 5L X60, the The customer does not want to accept the Api 5L Gr B pipe that was...
  5. brvs2014

    nozzles for bolted Tank

    I need the detail of the nozzles for bolted tanks, thank you very much help me with bibliography to review this topic, greetings
  6. brvs2014

    Should a choke valve always be used in reinjection pipes (reinjection wells)?

    Should a choke valve always be used in reinjection pipes (reinjection wells)?
  7. brvs2014

    Weld Pipe # 1500 WITH A FLANGE # 2500 NEED TRANSITION OR WELD DIRECTLY?

    I have a pipe 6 "# 1500 but my Tien-in should do it on a # 2500 valve, the SCHD is the same for # 1500 and # 2500, you can either weld the flange directly to the pipe or I should relay transition by difference Thicknesses ??
  8. brvs2014

    Plant and Profile Trasnmision Line direct Buried

    Where can I find information to design the plans of Plant and Profile of a line of Direct tension underground, where I find examples .pdf or .dwg
  9. brvs2014

    How to enter support from an .text file

    I need to enter support in a pipeline of 3 km in length, I must place them every 8 meters, I appreciate your help with information if you can automate this from a .text file so you do not have to put them 1 by 1.
  10. brvs2014

    Differences between Pipe, API 5L X42 Psl1 and Pipe, Api 5L X42 Psl2

    Differences between Pipe, API 5L X42 Psl1 and Pipe, Api 5L X42 Psl2
  11. brvs2014

    Rating #150 o Rating #300 in stations or Platforms?

    Within oil stations, oil platforms that rating is recommended # 150 0 # 300 ?? Is this indicated in ASME B31.3? I consult it because since the pressures are very low I am considering Rating # 150, if I am wrong I would greatly appreciate your help.
  12. brvs2014

    What standard should be used to design vents in jacketed pipes at asphalted road crossings?

    What standard should be used to design vents in jacketed pipes at asphalted road crossings?
  13. brvs2014

    Design Tee and Barred Tee Datasheet

    I am designing a tee barred but I do not find the dimensions of bicelado and chamflan to design the Tee and then proceed with the details of the welded bars, I would be very grateful to help me with some catalog or datasheet
  14. brvs2014

    If I have a pipe above ground should I consider cathodic protection?

    If I have a pipe above ground should I consider cathodic protection? Or in which cases cathodic protection is strictly required?
  15. brvs2014

    There is some regulation to justify that the pipeline does not need to be buried

    I am in the process of designing a line of flow for crude with 6 "pipeline, the terrain where the pipeline route is designed has a very rugged geography, which would make trenching difficult, I have existing H frame supports, besides The local conditions do not present very high temperatures nor...
  16. brvs2014

    Bases and criteria for deciding whether or not to use an anchor block in a pipeline

    Develop the analysis of flexibility of a Pipeline however I am not clear with which criterion to use or not to use an anchor block, is there in any norm a backup to use or not anchor blocks ?? I appreciate your help

Part and Inventory Search