Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SDETERS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: wcfrobert
  • Content: Threads
  • Order by date
  1. wcfrobert

    Punching Shear check at Wall Ends and Wall Corners

    Hi All, This topic has been bothering me for the past few weeks. What are your thoughts about punching shear check at wall ends and wall corners? The CSA and ACI codes are strangely silence on this subject. Personally, I don't see how the slab can punch through at just the wall ends? What's the...
  2. wcfrobert

    Structural Integrity Steel in Two-Way Slabs

    Hello all. I have a question regarding bottom integrity steel provision for two way slab design. CSA 23.3 specifies a minimum integrity steel area at the four faces of a column (Asb = 2V / fy). In the case of a garage roof with 1-m of soil on top, If I were to design per CSA, I would need...
  3. wcfrobert

    Built-Up Beam Moment Splice

    Hello all, I am looking at installing a built-up beam that spans 18 ft. The problem is, I only have access to 2x6 lumber that is 12 ft long; so i have to splice them at the end somehow. In a continuous beams, you would just splice the ends at the support post. But i do not have an intermediate...

Part and Inventory Search