Dear All;
I have a container yard to design stormwater drainage facility (about 10 acre). As per the local standards - I have to calculate the runoff using the modified rational method for a 100 year storm event. The client requirements is to design a detention pond - and I have done so using...
Hi All;
I am designing a detention pond that will have no outflow - that means water will be detained till it evaporates. And of course I will design a primary spillway.
The pond will be concrete lined (or concrete canvas) and it will be in an aried environment - but when it rains it has a...
For the purpose of a short educational webinar about the AASHTO standards on geometric design I have spent about three hours trying to define clearly what is the difference between design controls and design criteria - the AASHTO way - and I found it is clear in the AASHTO green book - AASHTO...