I was wondering, do any counties/municipalities require Contractor's bidding for City jobs to require any erosion control certifications?
Many counties are placing a greater focus on environmental protection/bmps/npdes, etc and responsibilities on their staff for contractor oversight, I was...
Sorry guys if this is a repost. I posted this in the survey section also but thought it may be more appropriate here.
Most counties I believe have a standard spec or procedure on how the Contractor should preserve, protect, or replace a survey monument in case it is disturbed or damaged during...
Most counties I believe have a standard spec or procedure on how the Contractor should preserve, protect, or replace a survey monument in case it is disturbed or damaged during repaving procedures. Typical street monuments are embedded into the ground 3+' so it will be difficult to disturb the...
Would you wait until you receive the compressive strength test results before paying the Contractor 100% of concrete or shotcrete work? Our city specs are not very clear on this section. Some say pay a portion some say wait until the results pass the spec requirement. The work is completed in...