I'm a plumbing and fire protection designer. I have a fire chief who is upset at the architect for using Type V over Type 1 construction. We have a hydraulically designed building that requires 486 gpm with an additional 250 outside hose. Flow is 55 psi at system demand.
The fire chief is...