Should there be any regard to condensate on a snuff steam line? does it matter if the branches come off the side of the snuff steam header? Is water hammer a concern? In my particular case I am talking about snuff steam going to ductwork on an oil seed extraction plant.
Thanks,
Brian
Does boiler blowdown piping need to have sweep elbows (3 x radius) or double 45* elbows? I have some info from a boiler inspector requesting this on our blowdown piping but can not find any documentation to support this.
Thanks!
We currently use AutoCAD Plant 3D for our piping design projects. There has been a big push to get our company to start using Revit a lot more for our other mechanical systems. It has also mentioned that we could start using Revit for our larger industrial piping projects. Does anyone have...
A piping contractor recently made a comment on our piping saying that we should add a spool piece in between valves for "maintenance purposes". Has anyone else heard of this? If the valves allow I have always put them flange to flange to avoid extra pipe and fittings.