Hey guys,
I've looked around some other threads and other links that Google has spewed back at me, but I thought I'd double check with piping experts here.
It's a very simple query from a non-piping engineer (I'm automation). We have a tank with an EN 1092-1 nozzle, named K1, of size = DN80...
Hi there,
I am wondering, what are the constraints on supplying a number of loads in the same ATEX zone with one breaker feed and daisy-chaining them? The supply is 230V, but the load demand is very small so we were hoping to link these devices and put them all on one circuit.
Is this...
Hi all,
My team and I have been posed with an interesting question today. We're not mechanical engineers so we're looking for some input and guidance.
We have a gas detector provided with a direct duct mount kit (Det Tronics 007525-005, horizontal mount for PIRECL sensor) that looks like a...
Hi gentlemen, I'm new to this forum!
I have a question regarding a PRV. There is an existing line of pressurised air that is planned to be divided at one user point into two. One branch will be reducing pressure to 2, and another should stay at 6. Now, is there a PRV, that will be pre-set to...