"Trying to design a soldier pile lagging wall using SPW911"
Tried to respond to your thread: thread255-412809 but I guess I was late, thread was closed.
PE was correct SPW911 will not do Soldier Pile walls.
I used ShoringSuite for years I've also used SPW911, TB Wall, and a proprietary program...
I need guidance on the spans between floor beams when using 2x6 Tongue & Groove (T&G) decking. The vehicles are contractor pickup trucks, 4000 lb maximum axle load. Are there any publications for these concentrated loads? I have found lots of information on uniform snow loads but I am concerned...