  1. crb7

    cooling load calculation bug in Designbuilder Software

    Hi I have modeled a 8-storey building in designbuilder software. there is a the problem in its cooling load report; The report indicates heat transfer in middle floors which are located between 2 conditioned spaces. I made the software to ignore thermal mass effect. Is it a bug in the software...
  2. crb7

    pressure regulating landing valve

    hi guys I have a problem with my pressure regulating landing valve.When i close nozzle and open landing valve, the connection will get out the its place: But all of a sudden, in one of the fire cabinets, the air vent open and a little air comes out, then the connection stays in its place...
  3. crb7

    humid weather in basement

    hi guys i have a problem with my design and i will appreciate if anyone can help me. i have a room in basement, that has high humid weather. its a residential room. is it possible to use exhaust fan for reducing humidity? if yes, how many ACH should i take?
  4. crb7

    salt spray test for fire alarm devices

    hi guys; Is there any approval (like fm ,ul or lpcb) or standard code for salt spray test for fire alarm systems? I live in an island with 85% humidity which seawater causes corrosion in fire alarm devices which have lpcb approvals.
  5. crb7

    detectors in high humidity weather

    hi guys; Which kind of smoke/heat detectors is suggested in high humidity weather? I'm working in an Island which humidity have destructive effects on detectors, and after a period of time make false alarms.
  6. crb7

    fire extinguishers

    hi guys; I have a petroleum factory which is stored flammable liquids in tanks. There is a table in NPFA10 that tell us the fire extinguisher size and placement for class B fire. But also there is paragraph which is said: 6.3.2.3 For flammable liquid hazards of appreciable depth, a Class B...
  7. crb7

    hudrulically pipe sizing

    hi guys I want to choose pipe sizes for fire sprinkler system. The Hazan-Williams formula have flow rate, pressure loss and pipe diameter. For determining the pipe diameter, the value of flow rate and pressure loss have to be known. We have flow rate from the required flow rate for each...
  8. crb7

    sprinkler above drop ceiling

    Hi guys Its about 5 days that Im researching about sprinkler above drop ceiling but I can decide its a mandatory to install sprinkler above drop ceiling or not. In NFPA there are a few clauses about drop ceiling. 8.15.23 Spaces Above Ceilings. 8.15.23.1 Where spaces have ceilings that are lower...
  9. crb7

    Sprinkler above false ceiling

    Hi guys May you tell me the height above false ceilings which needs sprinkler? Im working on a project which this height is 2.2m.
  10. crb7

    required flow rate

    Hi guys, In nfpa 13 we have a table for determining required flow rate for hose stream. May you tell me what tell me which number in second column is required? for example for light hazard we have 0, 50 and 100 gpm for hose stream flow rate. which one shall we consider?
  11. crb7

    time limitation for dry pipe systems

    Hi friends, Please read this part of NFPA13:2016 A.7.2.3.1 The 60-second limit does not apply to dry systems with capacities of 500 gal (1900 L) or less, nor to dry systems with capacities of 750 gal (2850 L) or less if equipped with a quick-opening device. This part allow us to omit the time...
  12. crb7

    number of sprinkler heads per riser

    dear friends, May you tell me is there any limitation in number of sprinkler heads per riser for multistory buildings? Table 23.7.3.4 in NFPA 13 determine the number of sprinkler heads for branch pipes based on pipe size. Shall we use that table for riser pipe size or we should use the area...
  13. crb7

    EPS (Expanded Polystyrene) warehouse fire suppression

    hi guys May you please tell me what kind of fire suppression systems, we have to use for a EPS warehouse? foam or water?
  14. crb7

    sprinkler head

    hi guys can u tell me, what kind of sprinkler is this?
  15. crb7

    number of sprinklers in light hazard

    hi guys, The table below mentioned the number of sprinklers for pipes below 4 in. I have residential building which have 126 sprinklers in 1 floor. Which pipe size can I choose for this project. [img https://res.cloudinary.com/engineering-com/image/upload/v1542627443/tips/Capture_jxeqbp.jpg TNX
  16. crb7

    buildings with highest number dry valves

    hi i have to make a report from buildings with highest number dry valves.Can you tell me about your projects and number of dry valves? tnx
  17. crb7

    sizing pump for separate risers of system III standpipe

    hi i have a system III standpipe which the wet riser and dry riser are separate. i want to size the pump for this system.shall i size the wet riser based on system II and dry one based on system I in NFPA 14? i mean assuming 100 gpm for wet riser and 500 gpm for dry riser. tnx for your help
  18. crb7

    water demand of hose

    hi i have a 13 stories commercial and office building that is partially sprinklered, i want to calculate requirement water flow rate for hose streams. shall i consider 500 gpm for hose stream flow rate? or 1250 gpm because of lack of sprinkler system? the building is in light hazard. tnx for ur help