Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: lpz31415
  • Content: Threads
  • Order by date
  1. lpz31415

    CORNER REINFORCEMENT PUNTUAL LOAD - BIBLIOGRAPHY

    Hi all! Lastly I've been dealing with some sand jacks placed near the border of the pier cap of a bridge. (Ø20cm, 20cm from axis to border of the pier cap) I've been required to justify if it's neccesary to provide an specific reinforcement due to this temporary load. ¿Do you know where I can...
  2. lpz31415

    Welding point instead of hook in pile stirrups

    Hi all! I've a question about shear reinforcements in a pile. In my worksite the rebar provider has send us the rebar cage shear reinforcement in a different way is was in the construction drawings. Link Link In original drawings, the details was like this (there was a hook): Link Is this...
  3. lpz31415

    Crack width matters in transient situations?

    I'm designing a wall wich requires crack width checking (spanish code). In a transient state crack width check fails, but for the final state it's ok. Transient state duration will be maximum 2 months. Any suggestion about how to consider this issue? As I understand, crack width should be...
  4. lpz31415

    Hi all! When evaluating the earth

    Hi all! When evaluating the earth pressure forces in a wall wich is supporting a cohesive soil, we use to consider the effective parameters (effective friction angle and effective cohesion). I've always done this in this way by inertia because I was taught to to that. (consider water table at...

Part and Inventory Search