I am asking if anyone has knowledge of a method, model, or "canned" process to address discovery issues that require fixes on the fly in an effort to protect the critical path on the far larger project.
Here is my situation. I am titled an "Emergent Issue Team Manager". I work in commercial...
A leak developed on a weld at my station.
What we have is a 52" horizontal run of High Pressure Turbine Extraction Steam piping. At the bottom of the line is welded a 12x12x4 tee. The Tee is vertical, one 12" end welded to the invert of the 52", the other reduced to 2" for a manual drain valve...