Dear Sir,
We have a frame 5 GT of BHEL of Capacity 20 MW and the control system was upgraded from Mark IV to MArk VIe.The exhaust spread trip was not there earlier and the trip was incorporated after the upgradation. The problem detected was that the allowable spread becomes lower than the real...