I am having trouble sourcing a linear rail to be mounted overhead on a ceiling for a precision application with +/-0.1mm repeatability, manually operated at low speed <0.5m/s, 200kg load, track length of 20m. If I use two inverted Hiwin rails in parallel, would that be considered bad practice...