cross-posting from the Concrete forum...
Hi folks,
I have a question about the need for surface bonding.
I am building an accessory building here in Vermont, that will sit on a slab that is poured over frost wall. I have the footing and footing drains in place, footing has rebar throughout...
Hi folks,
I have a question about the need for surface bonding.
I am building an accessory building here in Vermont, that will sit on a slab that is poured over frost wall. I have the footing and footing drains in place, footing has rebar throughout and hook dowels.
I am starting to lay up...
Hi,
Background: I am in northern Vermont, constructing an accessory building. First floor is a slab and will be for small equipment storage, and tool storage. First floor will be heated. Second floor will be a finished guest loft (heated, water, etc.).
Foundation will be 6ft wall (to frost...
Hi folks,
I am planning to build a 24x32 accessory structure, for myself. One of the gable ends will be below grade (i.e., a walkout)
Location is northern Vermont.
For budget reasons, it will be a multi-year project.
I would like to phase it such that the site work, footings, and foundation...