Dear all, I work in water sector and I am new to the API requirements. For a cooling water BB1 pump the custoimer wants API plan 23/62 + cooling plan M. I have seen drawings of both the plans but I do not know how both of these plan work in combination i.e. 23/62. Does this mean that I need to...