Howdy y'all,
I have a client who bought an existing building and site and will have semi trucks delivering loads of chicken parts for redistribution. He wants to install a gravel turn-around/maneuvering area for the trucks at the back of his building where there's an existing loading dock. There...
Howdy, everyone,
I'm designing a commercial site for a 10,000 s.f. medical office building. The site is tight, only an acre, kind of long and narrow. I laid the building out with the long side (the "front") perpendicular to the public street. One double loaded parking lot (18' stalls, 24'...
Hi, folks,
I'm working on a project in Hall County, Georgia, where I may need to tie into a sewer line on the opposite side of a state highway. Does anyone have any approximate per linear foot costs for jacking and boring or directional drilling? That, and any advice you might have on the...
Hi, folks!
I'm designing a parking lot for an agri-entertainment site, specifically a farm wedding venue. Guests will be parking on grass (basically a pasture). What's the maximum slope I can have for automobile parking on grass? This venue will only have one or two weddings a week, so wear and...