Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Rich Zimmerman

    truss clips for non-load bearing walls.

    Do truss clips (simpson STC/DTC) make any sense with low-pitch roofs framed with I-Joists? Typically I've seen them with actual roof trusses, where unexpected point support under certain chords could be detrimental to the overall structure. But I'm trying to understand what the reasoning for...
  2. Rich Zimmerman

    Anchor Bolt Spacing 8"OC seems overkill

    I'm trying to check the work of my structural engineer. He's got 5/8" anchor bolts spaced at 8"OC attaching a sill plate to the top of a basement 6" ICF wall. Joists hang off the sill plate. 1-1/8" floor sheathing attaches to the top of the sill plate with 2 rows of #8 screws 4"OC. Say's...
  3. Rich Zimmerman

    4' overhang on shed roof with floor to ceiling windows.

    I'm wondering if one of you could comment on my roof detail. I'm going for a shed-style roof with a 4' overhang that's really "thin" looking. So the main/interior roof is framed with 14" TJIs and then I've nailed a 2x6 on the side that cantilevers over to provide the overhang. Not really a...
  4. Rich Zimmerman

    Cantelevered Rim Joist that's load bearing

    Quick question for ya'all. Here's the framing plan for the shed-style roof I'm working on So we've got a a 3-4' overhang all around. Not a big deal. Rim joist connection is generally pretty irrelevant in that it's not really holding much (if any) load. EXCEPT for the part labeled (in red) A...
  5. Rich Zimmerman

    Steel beam on top of ICF wall detail

    I've got a steel beam coming in perpendicular to an ICF wall). It sits on top of the wall (no pocket per-se). Both ends of the beam are supported the same way. Normally I would just drop a bearing plate with non-shrink grout and then weld the beam to the plate at the job site. However...

Part and Inventory Search