Hello, curious what ya'll think.
The engineer on a project I am building is not requiring an equipment ground conductor to be installed with the control conduit for 4-20 mA twisted shielded pair cable to from the PLC to instruments. We'll tie the cable shield to ground at the PLC, but we will...