Guys hi,
Looking for a quick and simply response to a technical issue regarding overall site power factor.
Situation. 3km of 132kv cable feeding a 56MVA transformer (132/11.5/11.5). 30 metres of 11kv cable connected to a 11kv switch panel. The load at the 11kv switchable is 3MVA. Local meter...