  1. khu

    Is there any requirement for a project alignment to be at the center of ROW?

    I have a project that is adding a bike lane, ditch, and sidewalk to an existing highway. We were directed by the client to maintain the existing lane and start our improvements at the edge of the lane (sawcutting inside and keeping lane line). One of the PMs in our office is adamant that the...
  2. khu

    24" Valve Anchoring?

    I'm working on a site project with our state DOT. On the project, there is a pond supplying water to the fire suppression systems in the buildings. There is a 24" transfer line between a pump building and the fire pond. In that line there is a 24" gate valve. The DOT designer included the...
  3. khu

    Understanding the 2 ft/s minimum sanitary "self-cleaning" velocity

    I need some help understanding the minimum 2 ft/s "self-cleaning" velocity referenced by the 10-state and many other standard documents. I've read the other posts on this subject, but my specific question was never quite answered that I could find. "All sewers shall be designed and constructed...
  4. khu

    Catch basins in gravel site

    The site is a maintenance yard with multiple buildings, but all the areas around the buildings are gravel (3/4" loose with some fines). The site experiences pretty bad drainage issues with many spots of localized ponding. There's not a way to grade the site to drain to one spot, so we will need...
  5. khu

    Fueling Station - Oil water separator for emergency spills

    I have an existing fueling facility (single 1,000gal tank) that was retrofitted a while back with a spill containment system that consists of a series of strip drains and catch basins to retain any spill during fueling. The issue is that the containment system has no outlet and is open to...
  6. khu

    Why is a fire flow analysis required here?

    I'll start off by saying that I don't do much SF residential work and most of my experience is on the public side, but I'm helping someone with a new 3-lot partition. The existing parcel is on a developed street. There are streets on either end of the block with mains and hydrants and there is...
  7. khu

    Max slope for 48" CSP culvert being installed on steep terrain?

    I'm being asked to design a culvert being installed at a pretty aggressive site. The channel in which the culvert will be placed is upwards of 20%. It looks like in the vicinity of the culvert, a ~17% slope in the culvert would work with the channel slope. I'm having a hard time finding...
  8. khu

    Pressure reported for hydrant test vs main pressure

    I'm trying to determine the pressure of a 10" main from hydrant test results. For some reason, I've always assumed those pressures were actual system pressures, but the water board is telling me the pressure in this line is actually ~170psi. Is there a way to convert these pressures to main...
  9. khu

    Controlling a really muddy construction site

    Finishing up plans for a new school and looking for some guidance on how to control a muddy job site. Currently, there is another school being constructed in the same city, and it's a mud pit. I've seen straw used on sites before, but is there any concern with the removal of straw before final...
  10. khu

    Modeling open-grate manhole as riser - Autodesk SSA

    I'm trying to model the outlet control for a detention pond and wanted to use an open-grate manhole as a riser with an orifice sized for 2yr 24hr and a barrel sized for the design storm event. I'm a bit confused on how to model the water entering the riser. Would this be a weir with a length =...
  11. khu

    FDC and Hydrant Connection Proximity - Impact to Flows

    Are there any restrictions with having an FDC connection located within ~ 10' of a hydrant connection on the same 12" line? I imagine there would be an impact to fire flow if the suppression system was running and they wanted to hook up to the hydrant, but I don't really do much modeling. The...
  12. khu

    Steep stormline terminating in manhole. Energy dissipation nozzle?

    We have a very steep site and will be sending stormwater down a hill to a swale and wanted to utilize a manhole as an energy dissipator at the bottom. I've seen installations like this around the city, but have never designed something like this myself. The site does not have room to...