Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SDETERS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: VladimirWH
  • Content: Threads
  • Order by date
  1. VladimirWH

    subsea equipment - cable tray for "spare" cables

    Hi! Designing a subsea gathering manifold ("GM"), with 10 cluster manifold ("CM") connection, I find out difficulties with cable tray configuration. For better understanding: gathering manifold has a typicaly cable tray system ("A" system) which is placed "inside" of it gathering manifold has a...
  2. VladimirWH

    Pressure safety valve best practise

    Hello! I have a question about calculating safety valve and inlet/oulet pipe. I know there are a lot of informmation in this forum about it but not exactly what I need. The thing is I'm working in russia with russian standart (GOST). In present time i'm worjing in unusual project and have some...
  3. VladimirWH

    How make central priming system for centrifugal pumps?

    Hello! I have some problem with central priming system (scheme attached). So, I have three centrifugal pumps (Q=1300 m3/h; H=90m; N=500kW), two of them primary, third - standby (P-001,P-002,P-003 in scheme). All system works on pantoon (barge), it's low lift station like. Customer want to use...
  4. VladimirWH

    Copper seal with stainless steel pipe

    Hello. I designed methanol dozen station, MOC - 316SS. So I used copper seal in gauge (pressure gauge, for example) place connection (flat type seal) like always. So, customer checked station's draws and other documentation and said, that using copper seal is not acceptebale. Now I have a...
  5. VladimirWH

    Double line with check valve and ball valve for Spill over system in tank

    Hello! I'm piping designer and preapre P&ID. So,I made spill over system with check valve but customer want to add ball valve in parallel line,and now it looks like double line one with cheack valve and another with ball vavle. Tank - 0,6 m3, atm. press., methanol. I can't understand why need...
  6. VladimirWH

    How does my profession translate into English

    Hello. I need some advise about how my current profession translate into English. I'm work CAD (autocad/inventor/kompas). Most of things i'm design in 3D. Recently design piping for chemical injection station (skid). Also I work on pumping stations, make steel constructions for it. It's call...
  7. VladimirWH

    Difficult with weld joints, WPS and duties

    Hello. I am mechanical designer. Now I work on foregein project (to me, I'm from Russia) basic on ASME, AWS, DEP and other special documents designed by buyer. My company work with that documents first time (usually we use GOST (ГОСТ) system). Project - methanol injection skid - consist of...
  8. VladimirWH

    Why DBB before pump have same class that discharge line?

    Hello. I got some comment about project - injection pump station, with diaphragm pump. So, station consist of tank-dbb- y-strainer -dbb-pump-membrane accumulator-*PSV*-check valve-rotameter-dbb (drain system I doesn't write). Class suction line - 150, discharge - 900. Client's specialist...

Part and Inventory Search